Skip to content
The global refrigeration industryHolodPrice catalogue ↗

Everything shaping
the world of cooling.

EN Select language
РусскийEnglish

Standards & safety

South Korea sets 10-year retention and digital reporting for mechanical-equipment inspection records

South Korea's revised Mechanical Equipment Act, effective 17 December 2026, introduces a ten-year retention period for maintenance and performance-inspection records and requires digital submission of performance-inspection reports within 30 days. The proposals apply to buildings and equipment within the statutory scope, not all structures.

Illustration of mechanical-equipment inspection and record-keeping regulation in South Korea
Kharn

South Korea is tightening record-keeping and reporting obligations for mechanical equipment. The Ministry of Land, Infrastructure and Transport opened public consultations on 19 November 2026 on amendments implementing the revised Mechanical Equipment Act, which is scheduled to take effect on 17 December 2026.

Key record-keeping and reporting requirements

The draft decree sets a ten-year retention period for both maintenance records and performance-inspection records. Under draft rule Article 7-4, performance-inspection records must be submitted through the designated information system within 30 days of completing the inspection. Maintenance records form a separate category: they are submitted only upon an authority's request, with a specified deadline not exceeding 15 days.

Scope and consultation timeline

The proposals concern buildings and equipment falling within the statutory scope of the Act, not every building. The consultation period closes on 30 November for the decree and on 10 December for the ministerial rule. The proposed reporting details are not yet final requirements.

Source

Draft ministerial rule

ORIGINAL SOURCE

Kharn ↗

Visit the original source for additional details.

← Back to news