Chillers & heat pumps
KDHC and LH to Test District Heating with Air-Source Heat Pumps in 328-Home Sejong Development
Korea District Heating Corporation and Korea Land & Housing Corporation plan a pilot pairing district heating with air-source heat pumps in a 328-unit public-rental complex in Sejong. Feasibility work is targeted for 2026, with trial operation in the second half of 2029.

Korea District Heating Corporation (KDHC) and Korea Land & Housing Corporation (LH) are advancing a pilot that combines district heating with air-source heat pumps to serve a 328-home public-rental apartment development in Sejong.
The tentative site is the UR2 block in Sejong's 5-2 district. The complex consists of 328 public-rental apartments.
The pilot is designed to examine how the two heat sources can be coordinated as heating demand shifts by season and time of day. Collected operating data would support a technical and economic assessment of the combined system and could inform the development of a standard model for apartment buildings.
The reported schedule calls for the following stages:
- Feasibility study – 2026
- Basic design – first half of 2027
- Trial operation – second half of 2029
Site selection and the commissioning schedule remain at the planning stage. The announcement does not report an operating installation, a confirmed heat-pump capacity, or measured energy savings.
Source: https://www.kharn.kr/news/article.html?no=32526
ORIGINAL SOURCE
Kharn ↗Visit the original source for additional details.


